Skip to content
Additional information please call: 01744 750269 support@mereuk.com

 

(M1407-33-M) Installation of FAAC Automatic Gates at Lansbury Primary School

The vehicle automatic gates have been designed for vehicle access only, Pedestrians have been diverted away from the automated vehicle entrance by directing pedestrians to a single automated single pedestrian gate entrance.

Completion Date: 01/07/19
Project Duration: 8 Weeks

Scope of works:

  • Automation of the existing vehicle entrance gates
  • Automationof the existing single pedestrian gate
  • Installation of Paxton Net2 access control
  • Installation of a videx audio intercom
Back To Top