Installation of FAAC automatic gates at Mill Green Primary School in St.Helens.
The vehicle automatic gates have been designed for vehicle access only, Pedestrians have been diverted away from the automated vehicle entrance by directing all foot traffic to a single automated pedestrian gate entrance.
At Mere UK we ensure that the design and installation are in compliance with regulations and the new EU Machinery Directive 98/37/EC and 2006/42/EC.
Completion Date: March 2018
Project Duration: 2 Weeks
Scope of works:
- Installation of 2 x FAAC operators to a set of existing double gates.
- Installation of Paxton Net2 access control for staff members.
- Installation of a Videx intercom system for visitor entry.