Installation of a FAAC 741 sliding gate operator at Winsford High Street Primary School
The sliding gates are controller by Paxton access control to access the school with the use of an exit loop to exit.
At Mere UK we ensure that the design and installation are in compliance with regulations and the new EU Machinery Directive 98/37/EC and 2006/42/EC.
Completion Date: 20/10/15
Project Duration: 3 Weeks
Scope of works:
- Installation of a FAAC 741 Sliding Gate Operator
- Installation of a Paxton Switch2 access control
- Installation of a video intercom